WORK AREAS

TRENCHERS

At GME we understand the needs of our clients’ projects. In order to provide the highest versatility, improved efficiency in terms of time and cost, and outstanding quality in trenching work, our fleet of machinery includes trenchers, which can be applied to any type of underground utility or service: wind farms, pressure pipelines, urban development works, photovoltaic plants (evacuation trenches, medium voltage, low voltage, CCTV, etc.), linear works (SOS, CAZ, etc.), irrigation systems, tunneling projects, and more.

They allow rock excavation with vertical slopes, without debris, with the option of laser-level depth control, and the reuse of excavated material as bedding or selected backfill. Various trench widths are available.

Our work

El Campillo II Wind Farm Campillo de Altobuey (Cuenca)

Terra Alta Irrigation, Phases III and IV Batea (Tarragona)

Aragón 3.1 Photovoltaic Plant Castelnou (Teruel)

Escatrón II Photovoltaic Plant Escatrón (Zaragoza)

Sierra de la Venta Wind Farm Pozo Cañada (Albacete)

Els Escambrons Wind Farm  Almatret (Lleida)

Segriá Sud Irrigation Maials (Lleida)

Segarra-Garrigues Irrigation, Pumping D L’Albagés (Lleida)

Bon Vent Wind Farm 11 Wind Turbines. Villalba dels Arcs (Tarragona)

Escatrón I Photovoltaic Plant Escatrón (Zaragoza)

Los Belos Photovoltaic Plant Muel (Zaragoza)

C-17 Widening, Section 3a Vinyoles (Girona)

Bielsa Tunnel (Internal Channeling) Parzán (Huesca)

Los Belos Photovoltaic Plant Monforte de Moyuela (Teruel)

Segarra-Garrigues Canal, Section V Les Borges Blanques (Lleida)

Alcañiz Industrial Park Alcañiz (Teruel)

Urban Water Supply Torre de l’Espanyol (Tarragona)

Menu